January 2019 | P-Cable high-res 3D contribute to increase in Wisting reserves

OMV report reserves increase from 350 to 440 million barrels on Wisting

The Wisting team has successfully combined data from six exploration and appraisal wells with 3D seismic data (both P-Cable high-res data and conventional broadband) and Controlled Source Electro Magnetic (CSEM) data in the technical studies for subsurface optimization.
P-cable has enabled very detailed interpretation of reservoir heterogeneity and compartmentalization and as a result also more accurate volume prediction (see also "Wisting is Growing" - expronews)

 

Posted in Uncategorized.